Elev8 Production Jobs
Daily tasks to stay ahead and deliver the best product quickly.
- Take a look at the inventory for all prebuilt vapes.
- Setting up new tubes to keep the rotation moving and fully stocked
- Full welding
- Lighting
- Cording
- Knobing
- Mix weld (as it needs to sit) and use with other production tasks
- Setting up new tubes to keep the rotation moving and fully stocked
- Take inventory for all glass and put in orders
- Wands
- Knobs
- Heater Covers
- Look at stock for Ballers
- Look at stock for all kits
- Build orders as needed
- Update stock as needed for all vaporizer production parts
- Take care of all repairs, trade-ins and other tasks associated to this process
- Take care of any production work that is outside of standard production to keep things moving and effecient.
- Maintenance
Weekly Tasks To Stay 100%
- Spot check ANY parts that are used in ANY production
- Inventory for Production
- Stock all kits
- Gather any parts that can be done by the head shop and make sure all tools are available.
Building Elev8 Products
Silver Surfer Build
- Building the disc
- Welding the disc in the housing & adding light
- Cording the vapes
- Testing Dimmers
- Wiring the dimmer and adding powercord
- Heater Assembly
- How to make bases
- Adding bases to the vapes
- Adding the heater cover to the SSV
- Welding Knobs
- Testing
- Serializing the Vaporizer
- Screening Wands
- Bagging
- Cutting Tubing or Hose for the whip
Wave Rider Silver Surfer Procedures
- Laser Engraving the Surfer
- Wave Rider Series Sublimation Process
- Building the WRS
- Sublimation Supplies
Super Surfer Build
DBV Build
SideKick Build
Elev8r Build
Building & Laser Engraving Grinders
Printing Labels
Trunk Build
Essential Oil Kit Build
Vape Part Fixes
Baller Series Kit Build
- Baller series kit
- Baller series kit to be sold WITH THE VAPORIZER
Unit Repairs
Repairs
Repairing Orders
- How to Tighten Tension Bar and Stand
- Dimmer Repair Video
- Dimmer Repair Kit Build
- Heater Repair Kit Build
- Testing Units for repair
- SSV
- DBV
- SUP
- LSV
- Changing out a heater stand and adding a restraint bar
- Drilling out knobs to reuse
- Tapping out a new screw hole
- How to ReCord a SSV and DBV Unit
- Replacing a power cord 220 volts
- Elev8 PID testing
- How to Re Weld Discs in SSV and DBV units
- Tools for repair

- Test the Unit
- Follow the Trello Card for the product in the Vapes repair trello board
- You can learn more about how we use trello here
Trunk Production
Glass Clamp Tool
Inhouse Production
Taking inventory with Elev8.one
